Charging infrastructure funding St. Gallen: PV & garage

The charging infrastructure funding in Canton St. Gallen supports new basic infrastructure in existing, non-public parking garages when at least four operational charging stations with load management are planned. A building counts as existing if it has a legally binding building permit issued before 31 December 2020; in mixed-use buildings, at least 30% of the energy reference area must be residential. For linked PV, at least 12 kWp must be built in the same project and a building permit must exist, so a separate proof of naturemade electricity is not required. Energieagentur St.Gallen GmbH handles applications through the e-Förderportal and decides under the guidance for measure M27. A single wallbox or a public charging station is outside this funding category.

Who qualifies for charging infrastructure funding in Canton St. Gallen?

In Canton St. Gallen, charging infrastructure in an existing, non-public parking garage qualifies with at least four operational charging stations and load management. Funding is CHF 300 per parking space for C1/C2, CHF 800 per space for level D and CHF 5,000 for PV built in the same project. Apply in writing before work starts.

Important

As of 30 August 2026, the decisive limit is not PV size but the funding category: St. Gallen guidance requires an existing, non-public parking garage with a building permit before 31 December 2020, at least four operational charging stations and load management. A single wallbox, a public installation or work started before application does not qualify for this contribution.

Key figures: Charging infrastructurefunding St. Gallen

Key figures for Charging infrastructurefunding St. Gallen, updated 30 August 2026
MetricValue
Minimum scope4 operational charging stations with load management
Building limitbuilding permit before 31 December 2020
PV as energy evidenceat least 12 kWp in the same project
ContributionsCHF 300 C1/C2, CHF 800 level D, CHF 5,000 PV
Application timingsubmit in writing before execution

What determines the right path.

The building age limits eligibility. Funding covers infrastructure in non-public parking garages of existing buildings whose building permit became legally binding before 31 December 2020. A newer building therefore does not fit this measure, even if its garage has four parking spaces and load management.

For mixed-use buildings, residential area is the threshold. Residential energy reference area must account for at least 30%. A commercial property with four charging points is therefore not automatically eligible; the agency needs the building use and the relevant energy reference area for classification.

System scale matters more than the number of prepared cables. The measure requires at least four operational charging stations at expansion level D and load management that can reduce, shift or prioritise total charging power. Under the guidance, a single wallbox does not count as funded charging infrastructure.

The energy source determines the evidence required. Without PV built at the same time, the infrastructure must run on naturemade quality level 2 electricity or an equivalent product. This supply proof is waived when a building-owned PV system of at least 12 kWp with a building permit is created in the same project; alternatively, proof of a ZEV or EVG totalling at least 12 kWp is sufficient.

The funding modules must be calculated separately. For C1/C2, meaning the connection line, protective equipment and any meters under SIA Merkblatt 2060, the contribution is CHF 300 per equipped parking space, capped at CHF 25,000 and 35% of investment costs. For operational level-D charging stations, it is CHF 800 per space, with at least four stations and a 50% investment cap. Linked PV receives a flat CHF 5,000.

The application date is a project risk. The written application with signed form and attachments must have reached Energieagentur St.Gallen GmbH before execution; starting earlier excludes the contribution. After the decision, the commitment remains valid for two years. A one-time extension can only be requested with reasons in writing before the deadline expires.

How the project stays cleanly managed.

  1. 1

    Check the building and usecollect the legally binding building permit issued before 31 December 2020, whether the garage is public or non-public, and, for mixed-use buildings, the residential share of the energy reference area. The 30% threshold must be clarified before technical design.

  2. 2

    Choose the energy sourcedecide whether the infrastructure will use naturemade quality level 2 or equivalent electricity, building PV created at the same time, or a ZEV or EVG. For PV, include the 12 kWp minimum and required building permit in the project documents.

  3. 3

    Design the infrastructure under SIA 2060plan the connection line, protective equipment and any meters as C1/C2, plus at least four operational charging stations as level D. The load management must show how total power is reduced, shifted or prioritised; multiple entrances or floors still count as one garage.

  4. 4

    Separate funding modules and cost evidenceshow C1/C2 at CHF 300 per parking space, capped at CHF 25,000 and 35% of investment costs, level D at CHF 800 per space and capped at 50%, and linked PV at CHF 5,000. This makes clear which quote item belongs to which funding module.

  5. 5

    Submit the complete applicationenter the online form in the e-Förderportal and send the signed form and required attachments to Energieagentur St.Gallen GmbH. These include a map extract, parking-garage plan, quote including installation and CE conformity, and evidence of the electricity source or PV, ZEV or EVG data. Receipt must be before execution.

  6. 6

    Sequence decision and implementationthe agency reviews the application and, if approved, issues a funding commitment valid for two years. Starting after submission but before the decision is at the applicant’s own risk. After completion, submit the project-completion notice and attachments; payment follows only after a successful final inspection.

Questions to settle before the quote.

  • Prove an existing, non-public parking garage and a legally binding building permit issued before 31 December 2020
  • Plan at least four operational charging stations with load management according to SIA Merkblatt 2060
  • Document PV of at least 12 kWp in the same project or naturemade electricity as the energy source
  • Calculate CHF 300 for C1/C2, CHF 800 for charging stations and CHF 5,000 for linked PV separately

More questions: Charging infrastructurefunding St. Gallen

Official sources & references.

The responsible authorities are decisive. Always verify binding details – amounts, deadlines and conditions – for your specific property against the current status of the respective authority.

Continue

Relevant pages for the next step.

For St. Gallen, you'll find matching services, regional projects and related guides that take you forward in practical terms.

Regional service

Solar Installation St. Gallen – Planning to Commissioning

In Canton St. Gallen, installers benefit from knowledge transfer from the SPF Institute for Solar Technology in Rapperswil – one of Europe's oldest and most renowned solar research institutions (founded 1981, 40 employees). SAK provides efficient grid connection across Eastern Switzerland. Full MuKEn implementation since 2021 ensures predictable conditions from permitting to commissioning.

Guide

Pronovo one-time payment for PV in Canton Bern

How high the Pronovo one-time payment for a PV system in Canton Bern is, how it splits into a base and a capacity payment, when to file the application, and how federal funding, the absence of cantonal PV funding and the tax deduction relate to each other.

Regional service

PV Installation St. Gallen – Roof & Electrical

St. Gallen is an energy research centre: the SPF Institute for Solar Technology at OST in Rapperswil is among Switzerland's leading solar research institutions. SAK compensates from 6 Rp./kWh + HKN. The City of St. Gallen provided municipal supplementary subsidies until 2024; since 2025 the focus is on economic amortisation within 10–15 years. The canton fully implemented MuKEn 2014 since 2021.

Guide

PV bonus for roof renovation in Canton Zug

When Canton Zug pays a PV bonus during roof or facade refurbishment, which area quota applies and why the funding application must be filed before work starts.

Service

Solar system installation

From the initial estimate and 3D survey through a transparent quote to full commissioning — one project, one process, one contact.