PV feed-in tariff Thurgau 2026: reference price

In 2026, the PV feed-in tariff in Thurgau follows the Swiss Federal Office of Energy (SFOE) quarterly reference market price in the Thurplus grid area, supplemented by a minimum remuneration of 6 Rp./kWh for systems up to 30 kW. This is the standard case for a small system connected to the low-voltage grid. A system on the medium-voltage grid, outside the Thurplus area or above the limits named by Thurplus requires a separate assessment and, where applicable, an individual agreement. For the economics, feed-in revenue, self-consumption, guarantees of origin and the Pronovo one-time incentive must be calculated separately. The first decisive point is therefore the responsible distribution-grid operator, not just the Canton of Thurgau.

How high is the PV feed-in tariff in Thurgau in 2026?

For a PV feed-in tariff in Thurgau, first verify the specific grid area. In the Thurplus grid area, the quarterly SFOE reference market price has applied since 1 January 2026; Thurplus also states a 6 Rp./kWh minimum remuneration for PV systems up to 30 kW. Before calculating economics, clarify the grid area, voltage level, system size, self-consumption and separate guarantees of origin.

Important

As of 25 August 2026, the SFOE reference market price varies by quarter and the Thurplus feed-in route does not automatically apply throughout the canton. For Q3 2026, the SFOE lists 14 October 2026 as the publication date; that value must not be anticipated. The binding points are the grid area, the current SFOE value and the conditions of the responsible grid operator.

Key figures: PV feed-in tariff Thurgau

Key figures for PV feed-in tariff Thurgau, updated 25 August 2026
MetricValue
Minimum up to 30 kW6 Rp./kWh according to Thurplus
Reference pricepublished quarterly by the SFOE
Publication timingby the 10th working day after the quarter ends
Thurplus special casemedium voltage with an individual agreement
Separate funding routePronovo EIV is not feed-in remuneration

What determines the right path.

Grid area rather than cantonal boundary: the Thurplus rule applies to the Thurplus grid area in Frauenfeld. If the property is served by another distribution-grid operator, its registration, metering and contractual conditions may differ; record the responsible operator before making any tariff assumption.

Price logic from 1 January 2026: the SFOE describes the quarterly reference market price as the harmonised Swiss price under Art. 15 para. 1 EnG when the grid operator and producer do not agree on remuneration. An annual figure from an old Thurplus tariff table is therefore not a reliable 2026 assumption.

Output class: Thurplus states 6 Rp./kWh for solar systems up to 30 kW and 6 Rp./kWh for the first 30 kW of systems between 30 and 150 kW with self-consumption. Compare the kW threshold with total installed output, not with the expected exported energy.

Voltage level and size: under its published rules, Thurplus remunerates systems in the low-voltage grid; medium-voltage systems require individual agreements. Thurplus also names 3.0 MWp or 5,000 MWh as the limit of the described feed-in route.

Self-consumption before feed-in: Thurplus itself points out that high self-consumption, storage or dynamic load management changes how solar power is allocated. The load profile, heat pump, wallbox and battery must therefore be modelled before comparing the result with the SFOE price.

Keep revenue streams separate: feed-in remuneration is settled per exported kilowatt-hour, while the Pronovo EIV is a separate federal instrument supporting the investment. Thurplus also mentions payment for guarantees of origin as an additional remuneration; these three items must not be merged into one flat solar-yield figure in the quote.

How the project stays cleanly managed.

  1. 1

    Confirm the grid areabefore the quote, use the address and grid connection point to establish whether Thurplus or another distribution-grid operator is responsible. For Frauenfeld, Thurplus’s solar feed-in page is the concrete starting point; the canton alone does not answer this question.

  2. 2

    Classify the systemrecord installed output, expected annual production and voltage level. The 30 kW and 150 kW thresholds, together with the 3.0 MWp or 5,000 MWh limits named by Thurplus, determine whether the published standard logic is sufficient or another contractual route is needed.

  3. 3

    Prepare metering and registrationregister the PV system with the responsible grid operator and clarify the technical connection. Thurplus requires a registered, technically correct system for remuneration and installs suitable metering where necessary.

  4. 4

    Calculate self-consumptioncompare the load profile, heat pump, wallbox and battery with feed-in. Use the current SFOE reference market price for the exported share; the SFOE publishes it by the 10th working day after the quarter ends, not as a fixed annual figure.

  5. 5

    Register funding separatelykeep the Pronovo EIV as an investment contribution separate from feed-in remuneration and any guarantees-of-origin payment. The current SFOE funding page refers to Pronovo for registration; show the three cash-flow elements as separate lines in the economic calculation.

  6. 6

    Document commissioningkeep the grid registration, metering concept, technical data and actual installed output consistent. For medium voltage or a system outside Thurplus’s standard limits, an individual agreement or written clarification must be in place before execution.

Questions to settle before the quote.

  • Identify the Thurplus grid area in Frauenfeld and the actual distribution-grid operator before requesting a quote
  • Include the 6 Rp./kWh rate up to 30 kW and the 30-to-150-kW rule for systems with self-consumption in the calculation
  • Keep the SFOE reference market price, self-consumption, storage and separate guarantees of origin as distinct revenue or value components
  • Prepare registration, metering, the Pronovo EIV and any medium-voltage agreement in the correct sequence

More questions: PV feed-in tariff Thurgau

Official sources & references.

The responsible authorities are decisive. Always verify binding details – amounts, deadlines and conditions – for your specific property against the current status of the respective authority.

Continue

Relevant pages for the next step.

For Thurgau, you'll find matching services, regional projects and related guides that take you forward in practical terms.

Regional service

Solar Installation Thurgau – Planning to Commissioning

In Thurgau, a feed-in limitation to 70% of installed panel capacity applies from 2026 for new systems – making self-consumption optimisation and storage an integral part of every project plan. Thurplus develops innovative virtual ZEV and LEG models with "EigenverbrauchMax" and "LokalenergiePlus". The Solarstrom-Pool Thurgau provides additional subsidies for steeply mounted winter-electricity systems.

Guide

Assessing PV economics in Canton Zug correctly

Assess which factors genuinely drive PV system economics in Canton Zug, from self-consumption and current WWZ tariffs to ZEV models, LEG and Pronovo one-time payment.

Regional service

PV installation in Thurgau – cleanly planned and registered

In Thurgau the canton-owned EKT AG operates the medium-voltage distribution grid, while the end-customer connection sits with local utilities such as Thurplus in Frauenfeld or Arbon Energie depending on the municipality. What matters here: the correct registration with the responsible grid operator and a look at the cantonal solar map, which shows per roof whether a building permit is required or a notification to the municipality suffices. For the canton's energy subsidy programme we coordinate the performance and base contributions plus the federal one-time payment.

Guide

Self-consumption, vZEV and LEG in Schaffhausen: using solar power correctly

Assess when self-consumption, vZEV or LEG make sense in Schaffhausen: check metering model, grid connection, storage, tenant electricity and Pronovo separately.

Service

Solar system installation

From the initial estimate and 3D survey through a transparent quote to full commissioning — one project, one process, one contact.

Guide

vZEV and local electricity communities: planning PV self-consumption in Schaffhausen

Assess when ZEV, virtual ZEV or local electricity community makes sense for PV in Schaffhausen: prepare metering concept, grid operator, participants, storage and billing cleanly.