What really matters for installation on site
Thurgau is Switzerland's largest fruit-growing region and sits on Lake Constance, where well-oriented barn, farm and commercial roofs offer ample surface for solar power. As early as Easter 2022 the canton produced more electricity than it consumed for the first time – with solar a central driver. We plan your PV system accordingly and handle coordination from roof structure to grid registration. Mounting structure per SIA 261, documented penetrations, SUVA-compliant fall protection and complete handover including string diagram, measurement protocol and photo documentation.
- Mounting structure matched to tile, sheet metal, facade or flat-roof systems – not generic, but dimensioned object-specifically to wind zone (SIA 261), snow loads and building height.
- Clean cable routing with documented penetrations and roof membrane protection. Every transition between roof and electrical installation is photographed and recorded.
- Coordination of scaffolding, fall protection (SUVA-compliant), installation logistics and object-specific safety requirements – including a mounting concept prior to material ordering.
- Photo documentation and traceable handover: single-line diagram, string plan, data sheets, measurement protocol, photos – everything needed for acceptance, grid operator and future service.