Skip to content
GuideFundingUri

PV incentives in Uri 2026: CHF 1,000 + CHF 250/kWp

Uri's 2026 PV incentive supports winter-optimised systems on existing buildings with a flat CHF 1,000 plus CHF 250 per kWp; systems must have at least 2 kWp and a module tilt of 60° to 90°. The complete application must have reached the Uri Office of Energy before installation starts, with mounting the modules counting as the start. A conventionally tilted roof system, a new build or replacement of an existing system is not eligible under funding path UR-06. The cantonal grant must be assessed separately from the federal Pronovo process and the enhanced M-01 grant for facade-integrated PV. This guide explains the process and evidence required for PV owners in Canton Uri, as of 2026.

How much is the PV incentive in Uri in 2026?

In Canton Uri, winter-optimised PV systems on existing buildings receive a flat CHF 1,000 plus CHF 250 per kWp in 2026, up to CHF 50,000. The system must have at least 2 kWp, a 60° to 90° module tilt and a complete application before the modules are mounted. New builds and replacements are excluded.

Important

As of 2026, UR-06 is not a general PV grant: a conventional roof tilt, a new build, a replacement system or an incomplete application before the modules are mounted is not enough for eligibility. Applicants who start after submitting a complete application but before the funding decision do so at their own risk under Uri's conditions; payment follows only after completion review and compliance with the requirements. On the calculation, note that the 2026 funding conditions and the overview sheet of the 2026 funding model are worded differently — "CHF 250 per kWp" versus "CHF 250 per additional kWp". What is binding is the decision issued by the Uri Office of Energy, not your own calculation.

Key figures: PV incentives Uri 2026

Key figures for PV incentives Uri 2026, updated 02 August 2026
MetricValue
Funding pathUR-06, PV for winter electricity
Grant amountCHF 1,000 flat plus CHF 250 per kWp (clarify the reading)
Technical thresholdAt least 2 kWp, module tilt 60° to 90°
BuildingUR-06: existing building; new builds and replacements excluded
Application timingUri Office of Energy: complete before mounting the modules

What determines the right path.

Funding path UR-06 targets winter electricity: the system must be grid-connected, have at least 2 kWp and use a module tilt between 60° and 90°.

The building status determines eligibility under UR-06: systems on existing buildings are supported, but replacements and installations forming part of a new build are not.

The timing of the complete application is critical: under the 2026 conditions, mounting the PV modules counts as the start of installation, so all required documents must have reached the Uri Office of Energy beforehand.

The calculation is worded differently across the cantonal documents: the 2026 funding conditions state "CHF 1,000 flat, from 2 kWp: plus CHF 250 per kWp", whereas the overview sheet of the 2026 funding model says "flat CHF 1,000, plus CHF 250 per additional kWp". The maximum of CHF 50,000 per system is undisputed, but the reading decides several hundred francs and should be clarified with the Office of Energy before filing.

Combination with the building envelope programme is limited: under the 2026 conditions, UR-06 cannot be combined with the enhanced M-01 grant for facade-integrated PV.

Payment depends on completion evidence: the Uri Office of Energy requires, among other items, a signed final form, photos of the new system, invoices and a fully completed and signed commissioning protocol.

How the project stays cleanly managed.

  1. 1

    Classify the roof or facade as part of an existing building and document at least 2 kWp and a 60° to 90° module tilt in the UR-06 design.

  2. 2

    Compare UR-06 and M-01 before finalising the quotethe 2026 conditions exclude combining the winter-electricity path with the enhanced grant for facade-integrated PV.

  3. 3

    Enter the application in Uri's funding portal, sign the generated application form and attach before-photos of the roof or facade area.

  4. 4

    Submit the complete application with all documents to the Uri Office of Energy before mounting the modules; under the 2026 conditions, work may begin at the applicant's own risk before the decision only after the submission is complete.

  5. 5

    After installation, secure the UR-06 evidencephotos of the new system, invoices for the funded measures and a fully completed and signed commissioning protocol are required for completion.

  6. 6

    Generate the signed final form in the portal, submit it with the completion documents and plan for payment only after the Uri Office of Energy has reviewed the file.

Questions to settle before the quote.

  • UR-06: CHF 1,000 flat payment, CHF 250 per kWp and a maximum grant of CHF 50,000
  • Document an existing building, grid connection, at least 2 kWp and a module tilt of 60° to 90°
  • Submit the required documents before mounting the modules and collect the completion evidence for payment
  • Distinguish UR-06 from the enhanced M-01 grant for facade-integrated PV and from Pronovo funding

More questions: PV incentives Uri 2026

Official sources & references.

The responsible authorities are decisive. Always verify binding details – amounts, deadlines and conditions – for your specific property against the current status of the respective authority.

Continue

Relevant pages for the next step.

For Uri, you'll find matching services, regional projects and related guides that take you forward in practical terms.

Regional service

Solar Installation Uri – Planning to Commissioning

In Canton Uri, the federal simplifications for rooftop systems in building and agricultural zones have applied since 2025 (notification instead of building permit). energieUri handles grid registration regionally. The Foehn valley offers ideal conditions – but alpine construction sites require project logic that accounts for weather, access and material logistics.

Guide

Pronovo one-time payment for PV in Canton Bern

How high the Pronovo one-time payment for a PV system in Canton Bern is, how it splits into a base and a capacity payment, when to file the application, and how federal funding, the absence of cantonal PV funding and the tax deduction relate to each other.

Regional service

PV Installation Uri – Roof & Electrical

The Uri valley floor benefits from Foehn climate with above-average sunshine hours. At altitudes above 1,000 m, PV yields increase by up to 20% compared to the midlands thanks to lower temperatures and snow reflection. energieUri as local provider offers HKN-based compensation – installation precision determines long-term yield under alpine conditions.

Guide

PV bonus for roof renovation in Canton Zug

When Canton Zug pays a PV bonus during roof or facade refurbishment, which area quota applies and why the funding application must be filed before work starts.

Service

Solar system installation

From the initial estimate and 3D survey through a transparent quote to full commissioning — one project, one process, one contact.

Guide

Photovoltaic incentives in Nidwalden: 2026 rules

Which cantonal support paths for photovoltaics exist in Nidwalden, how solar consultation works and what to check separately through Pronovo.