LEG photovoltaics in Uri: EnergieUri requirements 2026

In short

Can I form a LEG with neighbours in Canton Uri?

Yes, if the connections are in the energieUri grid area, the same political municipality and the same network level, and generation reaches at least 5% of participating end consumers’ connection capacity. energieUri checks the specific community; being neighbours or being in the same canton is not enough.

Background

#

LEG photovoltaics in Uri are possible in the energieUri grid area when the participating connections are in the same political municipality and on the same network level.

In the standard case, one or more PV systems contribute at least 5% of the total connection capacity of participating end consumers, and the relevant metering points use intelligent measurement. The LEG uses the public distribution grid; EnergieUri supplies residual electricity and pays for surplus energy, while the LEG must organise internal billing.

A key exception is a site outside the energieUri grid: this provider description cannot be transferred to the responsible grid operator. EnergieUri requires registration at least three months before formation.

For your roof

What your roof delivers for several households

With your address you see roof potential and yield. We then plan metering and billing for ZEV or vZEV with you.

Free and non-binding · no unsolicited calls
Rather talk directly? +41 78 615 90 58

What drives the economics

#
  1. The energieUri grid area is the first boundary: an address in Canton Uri is not proof on its own. energieUri describes its LEG service for connections in its own distribution grid; outside that area, the responsible grid operator must confirm the requirements and registration route.

  2. The municipality and network level determine the composition: energieUri’s requirements name the same political municipality, and the federal LEG framework requires connections on the same network level. Two nearby buildings in different municipalities therefore do not automatically belong in one LEG.

  3. The 5% ratio is calculated from connection capacity, not roof area or annual consumption. If participating end consumers have 100 kW of combined connection capacity, the generation capacity brought into the community must be at least 5 kW; adding consumption points increases the reference value.

  4. Intelligent metering is not a later convenience feature: the relevant connections and generation systems must be measured correctly under metering law so locally exchanged electricity can be allocated. Missing smart meters, unclear meter allocation or an uncoordinated metering concept can delay registration.

  5. Economics do not come from PV yield alone. A LEG uses the public distribution grid with reduced grid-use charges; local energy pricing, residual supply, metering, levies and internal billing remain separate items. EnergieUri pays for surpluses but does not set the LEG’s internal solar-power price.

  6. The start date is constrained technically and organisationally: energieUri requires at least three months’ lead time for forming a LEG. This period applies to registration with energieUri; it replaces neither PV grid-connection planning nor the coordination of metering, representation and internal billing.

The process in six steps

#

Tick off for your project

  1. Define the supply area and project goal

    record the address, political municipality, grid operator, metering point and existing or planned PV system for every property. Only the energieUri responsibility confirms whether this guide’s provider conditions apply.

  2. Collect participants and connection capacities

    list producers, storage operators and end consumers with their metering points and document the connection capacity of every consumption point. The total is the reference value for the minimum 5% generation capacity under Art. 19e StromVV.

  3. Pre-check the municipality, network level and topology

    confirm that all connections are in the energieUri grid, the same political municipality and the same network level. Physical proximity on a map does not replace technical confirmation by energieUri.

  4. Align PV capacity and metering

    calculate the planned generation against the 5% ratio and define how PV, storage and consumption will be measured. For the LEG, the relevant metering points must be billable through intelligent metering systems.

  5. Set the operating and billing model in writing

    before registration, determine who represents the LEG, how the local solar-power price is set and who issues internal invoices. EnergieUri supplies residual electricity and pays for surpluses; internal organisation remains with the LEG.

  6. Submit the LEG application at least three months in advance

    send the energieUri LEG application with participant, system and metering data and state the planned start date. Only after technical review should PV installation, meter work, storage operation and internal billing be scheduled definitively.

Checked for your roof, not just read up on

What your roof delivers for several households

With your address you see roof potential and yield. We then plan metering and billing for ZEV or vZEV with you.

Free and non-binding · no unsolicited calls
Rather talk directly? +41 78 615 90 58

Frequently asked questions

#

Sources

#

The responsible authorities are decisive. Always verify binding details – amounts, deadlines and conditions – for your specific property against the current status of the respective authority.

  1. Self-consumption, ZEV, vZEV and LEG

    energieUri · energieuri.ch

  2. LEG product sheet

    energieUri · energieuri.ch

  3. Energy supply – January 2026

    Swiss Federal Office of Energy, EnergySchweiz · pubdb.bfe.admin.ch

  4. Electricity Supply Act (StromVG), Art. 17d et seq.

    Federal Chancellery, Fedlex · fedlex.admin.ch

  5. Electricity Supply Ordinance (StromVV), Art. 19e et seq.

    Federal Chancellery, Fedlex · fedlex.admin.ch

Publisher: Vigorek GmbH

First published 8 September 2026 · Updated 8 September 2026