PV feed-in tariff in Nidwalden: EWN 2026

In the EWN supply area, the 2026 PV feed-in tariff in Nidwalden follows the reference market price published by the Swiss Federal Office of Energy (SFOE); EWN additionally pays 2 Rp./kWh for the quality of solar electricity. For PV systems below 150 kW, EWN also applies the statutory minimum remuneration under Art. 15 EnA from 1 January 2026. The reference market price under Art. 15 REO is published quarterly by 12 noon on the 10th working day after the end of each quarter, so it is not a fixed annual value. In the standard case, electricity is used on site first and only the surplus is exported; a battery, wallbox, ZEV or LEG changes the calculation. EWN feed-in remuneration is separate from the Pronovo one-time payment, and tariffs and settlement must be checked with the responsible grid operator outside the EWN supply area.

How high is the PV feed-in tariff in Nidwalden in 2026?

In the EWN supply area, solar electricity exported in 2026 is remunerated according to the SFOE reference market price, with EWN adding 2 Rp./kWh for solar quality. For PV systems below 150 kW, the statutory minimum remuneration is taken into account. The price is updated quarterly, while self-consumption and the Pronovo RU belong in separate economic calculations.

Important

As of 2026, the published 2 Rp./kWh solar-quality payment applies to the EWN supply area and not automatically to every property in Canton Nidwalden. The reference market price and minimum remuneration change the settlement periodically; the current EWN tariff information, responsible grid operator and confirmed metering point are therefore binding before ordering and commissioning.

Key figures: PV feed-in tariff Nidwalden

Key figures for PV feed-in tariff Nidwalden, updated 19 August 2026
MetricValue
EWN model 2026Reference market price plus 2 Rp./kWh for solar quality
Minimum remunerationTaken into account for PV systems below 150 kW from 1 January 2026
Update cycleThe SFOE publishes the reference market price by the 10th working day after each quarter
ScopeThe EWN tariff applies only in the EWN supply area
IncentiveThe Pronovo RU is separate from EWN feed-in remuneration

What determines the right path.

The responsible grid operator is the first decision. The published 2026 remuneration comes from Elektrizitätswerk Nidwalden (EWN) and applies to its supply area. A property in the canton of Nidwalden is therefore not automatically an EWN tariff location; the grid area, metering point and billing partner must be confirmed before quoting.

The date 1 January 2026 changes the minimum protection. For PV systems below 150 kW, EWN states that the statutory minimum remuneration is included in addition to the market-based logic. Art. 15 para. 1 EnA provides the legal basis for the nationally harmonised price when grid operator and producer cannot agree on remuneration.

The reference market price is a quarterly value. Under Art. 15 REO, the SFOE publishes it by 12 noon on the 10th working day after the end of each quarter; a project calculation in August 2026 must therefore not use an arbitrary annual average. The calculation should state the publication date and tariff period used.

Self-consumption and feed-in are two different value streams. Every kilowatt-hour used in the building for household demand, a heat pump, wallbox or business load is not settled as EWN feed-in. Only the remaining surplus falls under the EWN mechanism with the reference market price and 2 Rp./kWh for solar quality; the consumption profile and metering concept determine the result.

The 2 Rp./kWh is an EWN statement for the quality of solar electricity, not a uniform Swiss tariff. EWN lists this supplement in its 2026 electricity-price information in addition to market-based remuneration. It must therefore not be transferred to other grid operators or assumed to be guaranteed for future tariff years.

Pronovo is a separate funding track. The one-time remuneration (RU) is a federal investment contribution administered through Pronovo; it neither replaces EWN feed-in settlement nor the self-consumption assessment. The quote, incentive application and grid settlement must therefore state the same system capacity and commissioning status.

How the project stays cleanly managed.

  1. 1

    Establish the grid area and billing partnercompare the electricity bill, property address and metering point with EWN. EWN’s 2026 feed-in information applies directly only where EWN supplies the property; otherwise, the local grid operator must provide its conditions.

  2. 2

    Define system size and tariff modeldocument installed PV capacity, self-consumption, surplus export and any extension separately. If the system is below 150 kW, include the minimum remuneration under Art. 15 EnA in the calculation; EWN states this threshold explicitly.

  3. 3

    Record the tariff period usedtake the SFOE reference market price under Art. 15 REO for the relevant quarter from the current SFOE publication. According to the SFOE, publication is due by the 10th working day after the end of the quarter; outdated or estimated values must not appear unmarked in a quote.

  4. 4

    Model the consumption pattern before selecting componentsmap daytime load, heat pump, wallbox, battery, ZEV or LEG as separate scenarios. Show EWN feed-in, avoided electricity purchases and any metering or billing costs separately instead of valuing all generation with one tariff.

  5. 5

    Coordinate grid connection and commissioning with EWNplan the connection request, metering concept, meter, commissioning and feed-in using EWN’s technical documents. The existing Nidwalden grid-connection guide covers this workflow; finalise the remuneration calculation only after the metering and settlement logic is confirmed.

  6. 6

    Complete Pronovo and the economic assessment separatelysubmit RU documents with identical system data and document the revenue calculation using the specific quarterly value, EWN’s 2 Rp./kWh supplement and the self-consumption scenario. Reconcile any change in capacity or metering concept before commissioning.

Questions to settle before the quote.

  • Confirm the EWN supply area and responsible grid operator before requesting a quote
  • Classify PV capacity below 150 kW and the minimum remuneration under Art. 15 EnG
  • Track the reference market price under Art. 15 REO and its publication by the 10th working day after each quarter
  • Include the 2 Rp./kWh solar-quality payment, self-consumption and the Pronovo RU as separate items in the calculation

More questions: PV feed-in tariff Nidwalden

Official sources & references.

The responsible authorities are decisive. Always verify binding details – amounts, deadlines and conditions – for your specific property against the current status of the respective authority.

Continue

Relevant pages for the next step.

For Nidwalden, you'll find matching services, regional projects and related guides that take you forward in practical terms.

Regional service

Solar Installation Nidwalden – Planning to Commissioning

Nidwalden consistently implements the Energy Strategy 2050 with its revised Energy Act (since November 2021). The largest cantonal system is in Stansstad: 3,200 panels on a highway roof deliver approximately 750,000 kWh/year. The doubling mechanism for combined insulation and solar projects requires coordinated project planning that activates both subsidy streams.

Guide

Assessing PV economics in Canton Zug correctly

Assess which factors genuinely drive PV system economics in Canton Zug, from self-consumption and current WWZ tariffs to ZEV models, LEG and Pronovo one-time payment.

Regional service

PV Installation Nidwalden – Roof & Electrical

Nidwalden has a high rate of renovated buildings with solar systems. The region around Bürgenstock and Stansstad benefits from above-average solar irradiation thanks to its sheltered location on Lake Lucerne. EWN as local provider offers fair feed-in conditions. The canton doubles insulation subsidies (60 to 120 CHF/m²) when a solar system is installed simultaneously – making combined roof projects particularly attractive.

Guide

Self-consumption, vZEV and LEG in Schaffhausen: using solar power correctly

Assess when self-consumption, vZEV or LEG make sense in Schaffhausen: check metering model, grid connection, storage, tenant electricity and Pronovo separately.

Regional service

Flat-Roof Photovoltaics Nidwalden – Loads, Roof Protection and Mounting

In Canton Nidwalden, flat roofs on commercial buildings and multi-family homes represent the largest untapped solar area. Nidwalden actively promotes PV expansion through its energy law. New buildings require renewable energy systems – a PV system is the most common path to compliance. MuKEn 2014 implementation is progressing stepwise.

Guide

vZEV and local electricity communities: planning PV self-consumption in Schaffhausen

Assess when ZEV, virtual ZEV or local electricity community makes sense for PV in Schaffhausen: prepare metering concept, grid operator, participants, storage and billing cleanly.