PV incentives Geneva: SIG Prime solaire 2026

The Geneva PV incentive through SIG’s Prime solaire supplements the Pronovo one-time incentive in 2026: 25% of the PRU applies to new self-consumption systems from 2 to under 30 kWc, and 15% to systems from 30 to 100 kWc. The system must be commissioned and certified by Pronovo after 1 January 2026. SIG pays the Prime solaire after certification if the criteria are met; awards remain subject to the available budget. Planning must therefore align the capacity band, metering, Pronovo documents and the process with Services Industriels de Genève.

How high is the PV incentive in Geneva in 2026?

In Geneva, SIG supplements the 2026 Pronovo PRU with the Prime solaire: 25% of the federal incentive for new self-consumption systems from 2 to under 30 kWc and 15% for 30 to 100 kWc. The system must be commissioned and certified by Pronovo after 1 January 2026; SIG then contacts eligible owners.

Important

As of 2026, the SIG Prime solaire is not a flat Geneva grant and does not replace the Pronovo PRU. It applies only to the new self-consumption systems described by SIG, requires commissioning and Pronovo certification after 1 January 2026, and remains subject to budget and allocation. Check the current SIG page and the specific system before finalising an economic calculation.

Key figures: SIG Primesolaire Geneva

Key figures for SIG Primesolaire Geneva, updated 12 August 2026
MetricValue
SIG top-up up to 30 kWc25% of the Pronovo PRU for 2 to under 30 kWc
SIG top-up 30 to 100 kWc15% of the Pronovo PRU
Cut-off dateCommissioning and Pronovo certification after 1 January 2026
RequirementNew PV system in the Canton of Geneva with self-consumption
PaymentSIG contacts eligible owners after certification, within the available budget

What determines the right path.

Certified capacity determines the percentage. SIG specifies a Prime solaire of 25% of the Pronovo PRU for new self-consumption systems from 2 to under 30 kWc and 15% for 30 to 100 kWc. The funding calculation must therefore match the capacity certified later.

Self-consumption is an explicit requirement for the SIG Prime solaire. A system planned exclusively for feed-in must not automatically be budgeted with the SIG top-up; the self-consumption and metering concept must be defined before ordering.

The cut-off date is 1 January 2026. For the 2026 Prime solaire, SIG requires a new system commissioned and certified by Pronovo after that date. An older system cannot enter this incentive route merely through a later registration.

Pronovo and SIG have separate roles. Pronovo assesses the federal incentive and certifies the system; SIG provides the additional utility incentive as a percentage of the PRU. Both steps must remain separately traceable in the quote and document plan.

Payment does not happen with the first quote. After installation, meter adjustment, conformity inspection and Pronovo validation, SIG contacts eligible owners by email and finalises the payment. Missing contact details or incomplete certification can delay the process.

The Prime solaire is subject to budget and allocation limits. SIG states that premiums are awarded within the available budget and that SIG retains discretion in awarding them. The Prime solaire must therefore not be entered into an economic calculation as an unconditional guaranteed amount.

How the project stays cleanly managed.

  1. 1

    Define capacity band and usebefore quoting, document the planned certified capacity, self-consumption, any battery and intended feed-in. This allows planning for the 25% band below 30 kWc or the 15% band from 30 to 100 kWc.

  2. 2

    Calculate the Pronovo PRU separatelythe federal incentive is handled through Pronovo. Check the PRU programme, system type and capacity data in the Pronovo calculator or customer portal, and show the federal amount separately from the SIG Prime solaire.

  3. 3

    Align the project and metering concept with the SIG caseself-consumption, meter location, inverter, grid connection and contact address must describe the same project version. SIG notes that the installer usually coordinates the next administrative steps.

  4. 4

    Install the system and have the meter adjustedafter installation, the installer notifies SIG; SIG configures or replaces the electricity meter. Only from this metering stage is exported energy recorded for feed-in remuneration.

  5. 5

    Complete the conformity check and Pronovo certificationthe installer arranges the acceptance inspection and certification through an authorised body. After validation, Pronovo informs the owner and SIG.

  6. 6

    Complete the SIG form and await paymentafter certification, SIG emails eligible owners the form for the Prime solaire. Check contact details, bank information and certification status; payment depends on the SIG criteria and available budget.

Questions to settle before the quote.

  • Classify 25% or 15% of the Pronovo PRU by certified capacity band
  • Document self-consumption, commissioning after 1 January 2026 and a new system
  • Reserve the meter adjustment, conformity inspection and Pronovo certification in the workflow
  • Calculate the SIG Prime solaire, Pronovo PRU and feed-in remuneration separately

More questions: SIG Primesolaire Geneva

Official sources & references.

The responsible authorities are decisive. Always verify binding details – amounts, deadlines and conditions – for your specific property against the current status of the respective authority.

Continue

Relevant pages for the next step.

For Genf, you'll find matching services, regional projects and related guides that take you forward in practical terms.

Regional service

Solar Installation Genf – Planning to Commissioning

In Canton Genf, defensible quotes, clean project steering and commissioning without loose ends matter most. In the Canton of Geneva, the SIG Prime solaire tops up the Pronovo one-time payment from 1 Jan 2026: 25% for systems of 2 to <30 kWc and 15% for 30 to 100 kWc. There is also an SIG battery storage contribution of CHF 130/kWh (max. 15 kWh) plus the full tax deduction. Register the application before construction starts – rates are updated periodically.

Guide

Pronovo one-time payment for PV in Canton Bern

How high the Pronovo one-time payment for a PV system in Canton Bern is, how it splits into a base and a capacity payment, when to file the application, and how federal funding, the absence of cantonal PV funding and the tax deduction relate to each other.

Regional service

PV Installation Genf – Roof & Electrical

In Canton Genf, clean project logic and clear ownership between roof and electrical work matter most. Geneva is the only Romande canton with a dominant full-service utility: SIG bundles electricity, gas, water, district heating, and telecom. This greatly simplifies ZEV projects and neighbourhood solutions because all grid questions are answered by a single partner.

Guide

PV bonus for roof renovation in Canton Zug

When Canton Zug pays a PV bonus during roof or facade refurbishment, which area quota applies and why the funding application must be filed before work starts.

Regional service

Flat-Roof Photovoltaics Genf – Loads, Roof Protection and Mounting

In Canton Genf, flat roofs on commercial buildings and multi-family homes represent the largest untapped solar area. Geneva consistently implements MuKEn principles. New buildings and major renovations must meet self-generation requirements; heating replacements clearly favour renewables. PV systems combined with heat pumps or district heating complements are the recommended standard.