Background
#PV feed-in payment in Uri in 2026 follows the quarterly BFE reference market price in the energieUri grid area.
For PV systems below 30 kW, the R.30 return product provides at least 6.00 Rp./kWh; prices are shown excluding VAT. Between above 30 and 150 kW, energieUri distinguishes systems with and without self-consumption, while systems above 150 kW up to 3 MW have no minimum payment in the product sheet. Guarantees of origin (HKNs), Pronovo EIV, self-consumption and exported electricity are separate items and should not be mixed in the economic model. This guide covers the energieUri grid area and does not replace a current product confirmation or quote.
For your roof
How much funding does your roof get?
With your address we calculate the one-off payment, your canton’s incentives, tax deduction and regional feed-in tariff for your system.
Free and non-binding · no unsolicited calls
Rather talk directly? +41 78 615 90 58
What drives the economics
#The grid area comes first: energieUri return products apply to energy fed into the energieUri network. An address in Canton Uri alone is therefore not proof of the tariff if the local grid operator differs; the grid area and contracting party must match on the quote.
The capacity class is determined under Art. 13 EnV: the product sheet uses the normalised DC peak capacity on the front side of the PV modules. R.30 covers below 30 kW, R.150 above 30 to 150 kW and R.150+ above 150 kW to 3 MW; AC inverter capacity and DC system capacity must not be confused.
Self-consumption changes the floor in the R.150 range: for R.150 PV mEV, the share below 30 kW has a 6.00 Rp./kWh floor, while the share above 30 kW has a 0.00 Rp./kWh floor in the product sheet. R.150 PV oEV without self-consumption instead shows a 6.20 Rp./kWh floor for above 30 to 150 kW.
The variable payment is not a fixed annual tariff: energieUri settles quarterly using the BFE reference market price for the relevant technology. The SFOE publishes the value by 12:00 on the tenth working day after the quarter ends; all product prices exclude VAT.
HKNs are a separate marketing step: from 2026, energieUri lists 1.00 Rp./kWh for PV HKNs in the winter half-year from 1 October to 31 March and 0.50 Rp./kWh in the summer half-year from 1 April to 30 September. Acceptance is not guaranteed; assignment requires a standing order in Pronovo’s HKN system.
The economic model must keep exported electricity and self-consumption separate. The energieUri product sheet names EnG Art. 15, EnV Arts. 12 and 13, and EnFV Art. 15 as its legal bases; the current product version, metering concept and specific quote remain decisive.
The process in six steps
#Tick off for your project
Confirm the grid area
check the connection or electricity bill to establish that the system feeds into the energieUri network and that energieUri is the contracting grid operator. Record the municipality, metering point and grid operator for the connection request.
Determine system capacity correctly
have the normalised DC peak capacity under Art. 13 EnV documented and classify the project as R.30, R.150 PV mEV, R.150 PV oEV or R.150+ PV. The class must be named consistently in the technical sheet and quote.
Define self-consumption and metering
document whether the site self-consumes electricity, how the meter records quarter-hour values and whether storage, a heat pump or an EV charger changes the load profile. Between 30 and 150 kW, this classification determines the payment floor.
Confirm exported electricity and HKNs separately
request the current 2026 return-product and HKN versions from energieUri. For HKNs, check the seasonal 1.00 and 0.50 Rp./kWh rates, the lack of an acceptance guarantee and the Pronovo standing order as a separate process.
Plan for the reference market price correctly
use the BFE reference market price for each settlement period and note its publication by 12:00 on the tenth working day after the quarter ends. Model the price excluding VAT and add the class-specific statutory floor logic.
Check the quote and settlement
compare the value of self-consumption, export revenue, HKNs, purchased electricity, metering costs and any grid reinforcement separately. Before installation, the grid connection, metering concept and named energieUri product class must align in writing.
Checked for your roof, not just read up on
How much funding does your roof get?
With your address we calculate the one-off payment, your canton’s incentives, tax deduction and regional feed-in tariff for your system.
Free and non-binding · no unsolicited calls
Rather talk directly? +41 78 615 90 58
Frequently asked questions
#Sources
#The responsible authorities are decisive. Always verify binding details – amounts, deadlines and conditions – for your specific property against the current status of the respective authority.