Bidirectional wallbox subsidy in Lucerne: CHF 2,000

In short

How much is the subsidy for a bidirectional wallbox in Lucerne?

Canton Lucerne pays CHF 2,000 per bidirectional DC charging station.

Conditions include residential use, installation and commissioning after 1 January 2026, exclusively renewable electricity and SIA 2060 installation standard D. The completion documents must be filed within three months.

Background

#

The subsidy for a bidirectional wallbox in Lucerne is CHF 2,000 per bidirectional DC charging station when it is used in a residential building in Canton Lucerne.

Owners planning PV, storage and e-mobility together should assess this grant as a separate funding element alongside the system design. The station must be installed and commissioned after 1 January 2026, use electricity exclusively from renewable sources and meet installation standard D, “Ready to charge”, under SIA leaflet 2060 (2020 edition).

In the standard case, the application is filed only after commissioning; no pre-construction application is required for this incentive. The completion documents must reach the canton’s Environmental and Energy Office no later than three months after commissioning. A conventional one-way AC wallbox does not fall under this specific incentive item.

What counts for funding

#
  1. The building type determines the funding route: section 23.1 of Lucerne’s 2026 funding conditions covers bidirectional charging stations for vehicles in residential buildings. A station in a purely office or commercial building must therefore not be budgeted under this residential-building programme.

  2. The charging technology is decisive: section 23 of the funding conditions requires a bidirectional charging station with DC current and installation standard D, “Ready to charge”, under SIA leaflet 2060, 2020 edition. A one-way AC wallbox does not meet this combination.

  3. The timing must be demonstrable: section 23.2 requires installation and commissioning after 1 January 2026. The invoice and signed commissioning record should show this date clearly; otherwise eligibility cannot be documented reliably.

  4. The electricity source is an eligibility condition: under section 23.4, the bidirectional station is eligible only when the electricity comes exclusively from renewable sources. This point therefore belongs in the technical plan and the completion documents.

  5. Multiple charging points follow a parking-space rule: section 23.5 permits several applications for one shared infrastructure, but only one per parking space; extensions are allowed. Parking-space numbers and previously funded stations must be traceable before ordering.

  6. The grant amount and deadline belong together: Canton Lucerne specifies CHF 2,000 per bidirectional DC charging station, while section 23.6 requires the completion documents no later than three months after commissioning. Ordering without a deadline plan can therefore put the claim at risk even where the technology is eligible.

The process in six steps

#

Tick off for your project

  1. Classify the funding case

    confirm the building, location in Canton Lucerne, bidirectional DC station and residential use against the Lucerne funding page and section 23.1. A conventional AC wallbox or purely commercial site belongs to a different assessment route.

  2. Define the technical configuration

    obtain written confirmation from the installer that the station is bidirectional with DC current and meets installation standard D, “Ready to charge”, under SIA leaflet 2060, 2020 edition. The confirmation must match the later completion attachment.

  3. Check electricity source and parking spaces

    before ordering, document that the electricity is exclusively renewable and, for shared infrastructure, record which parking spaces receive a station. Section 23.5 limits funding to one application per parking space.

  4. Schedule and complete the installation

    the station must be installed and commissioned after 1 January 2026. Keep the invoice, system description and signed commissioning record consistent with section 23.2 and the actual project date.

  5. Prepare the completion application

    enter the details in Lucerne’s building-programme portal and sign the generated form. The review dossier must include the invoice, commissioning record and the installer’s confirmation of installation standard D.

  6. File within three months

    submit the complete completion dossier to the Environmental and Energy Office no later than three months after commissioning. For several stations, attach the parking-space allocation, individual invoice items and renewable electricity evidence so that no station is claimed twice.

Checked for your roof, not just read up on

Once the framing is clear, a property-specific check with roof, grid and documentation is worthwhile.

Request project

Frequently asked questions

#

Sources

#

The responsible authorities are decisive. Always verify binding details – amounts, deadlines and conditions – for your specific property against the current status of the respective authority.

  1. Basic infrastructure for e-mobility and bidirectional charging stations

    Canton of Lucerne, Environment and Energy (uwe) · uwe.lu.ch

  2. Energy incentive programme 2026: conditions, grants and application attachments

    Canton of Lucerne, Environment and Energy (uwe) · uwe.lu.ch

  3. Energy FAQ: electric charging infrastructure and the funding process

    Canton of Lucerne, Environment and Energy (uwe) · uwe.lu.ch

Publisher: Vigorek GmbH

First published 23 August 2026 · Updated 23 August 2026