GuideFundingLuzern

Bidirectional wallbox subsidy in Lucerne: CHF 2,000

The subsidy for a bidirectional wallbox in Lucerne is CHF 2,000 per bidirectional DC charging station when it is used in a residential building in Canton Lucerne. Owners planning PV, storage and e-mobility together should assess this grant as a separate funding element alongside the system design. The station must be installed and commissioned after 1 January 2026, use electricity exclusively from renewable sources and meet installation standard D, “Ready to charge”, under SIA leaflet 2060 (2020 edition). In the standard case, the application is filed only after commissioning; no pre-construction application is required for this incentive. The completion documents must reach the canton’s Environmental and Energy Office no later than three months after commissioning. A conventional one-way AC wallbox does not fall under this specific incentive item.

How much is the subsidy for a bidirectional wallbox in Lucerne?

Canton Lucerne supports bidirectional DC charging stations in residential buildings with CHF 2,000 per station. Eligible systems must be commissioned after 1 January 2026, use exclusively renewable electricity and meet SIA 2060 installation standard D. The application follows commissioning, and the complete dossier must reach the Environmental and Energy Office within three months.

Important

As of 23 August 2026, Lucerne’s incentive is limited to bidirectional DC charging stations in residential buildings. The application is filed after commissioning and the completion documents must reach the Environmental and Energy Office within three months; an ordinary AC wallbox or a late dossier does not meet this specific funding route.

Key figures: Bidirectional wallbox subsidy Lucerne

Key figures for Bidirectional wallbox subsidy Lucerne, updated 23 August 2026
MetricValue
IncentiveCHF 2,000 per bidirectional DC charging station
TimingInstallation and commissioning after 1 January 2026
Completion deadlineCompletion documents no later than three months after commissioning
Technical standardSIA leaflet 2060, installation standard D “Ready to charge”, 2020 edition
Electricity sourceExclusively renewable energy

What determines the right path.

The building type determines the funding route: section 23.1 of Lucerne’s 2026 funding conditions covers bidirectional charging stations for vehicles in residential buildings. A station in a purely office or commercial building must therefore not be budgeted under this residential-building programme.

The charging technology is decisive: section 23 of the funding conditions requires a bidirectional charging station with DC current and installation standard D, “Ready to charge”, under SIA leaflet 2060, 2020 edition. A one-way AC wallbox does not meet this combination.

The timing must be demonstrable: section 23.2 requires installation and commissioning after 1 January 2026. The invoice and signed commissioning record should show this date clearly; otherwise eligibility cannot be documented reliably.

The electricity source is an eligibility condition: under section 23.4, the bidirectional station is eligible only when the electricity comes exclusively from renewable sources. This point therefore belongs in the technical plan and the completion documents.

Multiple charging points follow a parking-space rule: section 23.5 permits several applications for one shared infrastructure, but only one per parking space; extensions are allowed. Parking-space numbers and previously funded stations must be traceable before ordering.

The grant amount and deadline belong together: Canton Lucerne specifies CHF 2,000 per bidirectional DC charging station, while section 23.6 requires the completion documents no later than three months after commissioning. Ordering without a deadline plan can therefore put the claim at risk even where the technology is eligible.

How the project stays cleanly managed.

  1. 1

    Classify the funding caseconfirm the building, location in Canton Lucerne, bidirectional DC station and residential use against the Lucerne funding page and section 23.1. A conventional AC wallbox or purely commercial site belongs to a different assessment route.

  2. 2

    Define the technical configurationobtain written confirmation from the installer that the station is bidirectional with DC current and meets installation standard D, “Ready to charge”, under SIA leaflet 2060, 2020 edition. The confirmation must match the later completion attachment.

  3. 3

    Check electricity source and parking spacesbefore ordering, document that the electricity is exclusively renewable and, for shared infrastructure, record which parking spaces receive a station. Section 23.5 limits funding to one application per parking space.

  4. 4

    Schedule and complete the installationthe station must be installed and commissioned after 1 January 2026. Keep the invoice, system description and signed commissioning record consistent with section 23.2 and the actual project date.

  5. 5

    Prepare the completion applicationenter the details in Lucerne’s building-programme portal and sign the generated form. The review dossier must include the invoice, commissioning record and the installer’s confirmation of installation standard D.

  6. 6

    File within three monthssubmit the complete completion dossier to the Environmental and Energy Office no later than three months after commissioning. For several stations, attach the parking-space allocation, individual invoice items and renewable electricity evidence so that no station is claimed twice.

Questions to settle before the quote.

  • Confirm residential use in Canton Lucerne and bidirectional DC technology against the 2026 funding conditions
  • Prove installation and commissioning after 1 January 2026 with the commissioning record
  • Document SIA 2060 installation standard D and exclusively renewable electricity with the installer
  • Send the invoice, commissioning record and completion application to the Environmental and Energy Office within three months

More questions: Bidirectional wallbox subsidy Lucerne

Official sources & references.

The responsible authorities are decisive. Always verify binding details – amounts, deadlines and conditions – for your specific property against the current status of the respective authority.

Continue

Relevant pages for the next step.

For Luzern, you'll find matching services, regional projects and related guides that take you forward in practical terms.

Regional service

Solar Installation Luzern – Planning to Commissioning

Lucerne is one of the few cantons requiring solar systems even for comprehensive roof renovations – an extended obligation beyond the pure new-build mandate. From 2026 feed-in is remunerated on a market basis (SFOE reference market price, statutory minimum 6 Rp./kWh up to 30 kW plus HKN) and CKW offers dynamic tariffs that better reward self-consumption. For project management, this means metering concept and storage sizing must be designed for flexible tariff structures during the planning phase.

Guide

Pronovo one-time payment for PV in Canton Bern

How high the Pronovo one-time payment for a PV system in Canton Bern is, how it splits into a base and a capacity payment, when to file the application, and how federal funding, the absence of cantonal PV funding and the tax deduction relate to each other.

Regional service

PV Installation Luzern – Roof & Electrical

In Canton Lucerne, CKW (Axpo subsidiary) serves the entire grid area; from 2026 the feed-in is based on the quarterly SFOE reference market price, with a statutory minimum of 6 Rp./kWh up to 30 kW plus a guarantee-of-origin (HKN) payment. Lucerne fully implemented MuKEn 2014 and requires solar systems even for major roof renovations – not only new builds. The mild climate around Lake Lucerne reduces module temperature losses, while Central Switzerland strategically uses solar power to relieve winter electricity grids.

Guide

PV bonus for roof renovation in Canton Zug

When Canton Zug pays a PV bonus during roof or facade refurbishment, which area quota applies and why the funding application must be filed before work starts.

Service

Battery & Wallbox

47% of new Swiss PV systems are installed with battery storage today — we show transparently when LFP batteries (CHF 650–1'000/kWh, 15–20 years) pay off and when they do not. Self-consumption rises from 25–35% (PV-only) to 50–65% with battery and EMS.

Guide

Photovoltaic incentives in Nidwalden: 2026 rules

Which cantonal support paths for photovoltaics exist in Nidwalden, how solar consultation works and what to check separately through Pronovo.