Solar Installation Thurgau – Planning to Commissioning

In Canton Thurgau, owners usually want a clear project flow from first assessment to handover rather than a loose mix of subcontractors. That is exactly how we run solar projects – from the pre-check to documented commissioning.

Clarify before quoting

In Thurgau, a feed-in limitation to 70% of installed panel capacity applies from 2026 for new systems – making self-consumption optimisation and storage an integral part of every project plan. Thurplus develops innovative virtual ZEV and LEG models with "EigenverbrauchMax" and "LokalenergiePlus". The Solarstrom-Pool Thurgau provides additional subsidies for steeply mounted winter-electricity systems.

For a solar installation in Thurgau, success depends not only on module area but on the process: 3D survey, transparent quote, grid-operator coordination and commissioning with full documentation. Vigorek handles the full coordination — from the initial estimate to handover.

Prefer to contact us directly? Send your property address, annual electricity consumption (if known) and preferred timing. Roof photos or existing plans help with the initial assessment.

Project profile

Location

Thurgau

Service focus

Solar system installation

Regional fit

Thurgau

Context

How this service works in Thurgau in practice.

Thurgau comes with its own framework conditions – from incentives and tax treatment to technical requirements. From those, a cleanly managed project flow for your property takes shape.

  1. Service focus

    What the full installation secures on site

    Vigorek plans and delivers complete PV systems across all German-speaking cantons: solar modules, inverter, roof installation, electrical coordination and commissioning. Battery storage and a wallbox can be planned around your consumption. Your quote defines the scope and responsibilities.

    • Initial estimate and 3D survey (drone): roof, orientation, shading, electrical setup and possible constraints — before any quote is prepared.
    • Transparent quote with clearly separated line items: material, installation, scaffolding, electrical, registration, commissioning — each one individually listed.
    • Coordination of Pronovo registration, metering concept, grid-operator queries and meter replacement through to full commissioning.
    • Optional integration of battery storage, wallbox and energy management — only where the usage profile and expansion goals support it.
  2. Regional framework

    Why this canton shifts the priorities

    Thurgau: Swiss paradigm shift — first canton to subsidize ONLY facade systems (from April 2025). This signals the shift from roof to facade in the PV industry. Solar map immediately shows every owner their status. Solar power pool: 25 years of experience.

    • In Canton Thurgau, a pre-check saves time when permits, metering or electrical setup are not standard.
    • Owners want traceable quotes instead of aggressive package promises.
    • A documented commissioning reduces later questions and service overhead.
  3. Project logic

    How coordination makes the difference

    The order records these steps, responsibilities and required documents. Outstanding assessments belong in the schedule before work begins.

    • Pre-check for roof, shading, electrical setup and potential constraints.
    • Coordination of registration, metering concept and commissioning.
    • Clean handover with traceable documentation for operations and service.

Regional context

Solar system installation in Thurgau: what matters here

In Canton Thurgau, cantonal rules, the responsible grid operator and local permit procedures shape how a project is planned and delivered. The points below show what really matters before quoting, installation and handover.

Regional starting point
In Canton Thurgau, incentives, grid operators and permit procedures change the priorities for this service.
Service core
A complete solar installation depends on sequencing, grid-operator coordination, electrical planning and clean commissioning.
Grid & registration
For Canton Thurgau, grid operators such as Thurplus, metering concept and commissioning are aligned early.
Decision reason
In Canton Thurgau, a pre-check saves time when permits, metering or electrical setup are not standard.
Execution
Pre-check for roof, shading, electrical setup and potential constraints.
Economic frame
Feed-in tariff and self-consumption are matched to the property; in the canton, Marktpreis BFE (quartalsweise) + 6 Rp./kWh Min. bis 30 kW + 2 Rp. HKN (Thurplus, ab 2026) is one relevant reference point.

Cantonal framework

Which cantonal framework shapes the project in Thurgau.

The technical service stays the same, but the project frame changes with the canton. That is exactly where incentives, tax treatment and MuKEn requirements become strategically relevant.

Local context

Thurgau sets the economic pace for this service.

The "Mostindien" canton offers plenty of roof space on agricultural buildings and fruit storage halls – ideal for large PV systems. The Lake Constance region also benefits from a mild climate and above-average sunshine hours.

Tax and subsidy logic

The Canton of Thurgau allows full tax deduction for PV investments as property maintenance. Deductions can be spread over two consecutive tax periods if needed. Facade-exclusive from April 2025: CHF 200/kWp subsidy ONLY for facade systems pitched ≥75° (max CHF 10,000 per system, annual budget CHF 100,000). Pure roof systems: no cantonal subsidy since 1 Apr 2025. Swiss first! New for 2026: cantonal battery storage subsidy of CHF 1,000 flat from 10 kWh usable capacity (max. 25%, application before installation). Solar power pool: 25 years of history, 800+ systems, 16 MW capacity.

Permits and energy law

Interactive solar map: for every building the map shows whether notification or building permit is needed (Green = notification, Orange = permit, Red ISOS = strict review). Facade systems: own rules. Roof systems: standard notification procedure. Thurgau implements energy regulations pragmatically and has adopted parts of MuKEn 2014 into its cantonal energy law. New buildings have self-generation requirements – PV systems are the preferred solution.

Market signal and location

Thurgau: Swiss paradigm shift — first canton to subsidize ONLY facade systems (from April 2025). This signals the shift from roof to facade in the PV industry. Solar map immediately shows every owner their status. Solar power pool: 25 years of experience. Since April 2025 the canton (Solarstrom-Pool) subsidises exclusively facade systems pitched ≥75° with CHF 200/kWp, max. CHF 10,000 per system and an annual budget of CHF 100,000. Pure roof systems no longer receive a cantonal subsidy – here the federal Pronovo one-time payment remains the key direct support. New stationary battery storage with at least 10 kWh of usable capacity receives a one-time cantonal investment grant of CHF 1,000 in 2026 (max. 25% of total investment, application before installation, capped at 700 applications). Thurplus pays for exported solar power from 2026 on a market basis (quarterly BFE reference market price) plus 2 Rp./kWh for guarantees of origin, with a statutory minimum of 6 Rp./kWh up to 30 kW.

Facade bonus

CHF 200/kWp NUR Fassade (ab April 2025)

Further reading

Service and location details

Whether you want to go deeper into the service, explore the location context or compare projects in nearby regions – here is where you continue.

Nearby regions

The same service in other regions

Vigorek delivers this service in neighbouring cantons and municipalities too. Depending on location, subsidies and conditions can vary – a comparison is worthwhile.